Cubby house assembly tips: how to put a kit together without the stress
This page may contain affiliate links. See our affiliate disclosure.
A cubby house kit arrives as a stack of boxes, a bag of hardware and a set of instructions that always seem to have one confusing diagram. Most families get through it, but a little preparation makes the job faster, safer and a lot less frustrating.
These are general tips for assembling a typical timber or plastic kit. Always follow the maker’s instructions first, because they know the product. We have not tested any kit and we do not publish time estimates or prices.
Before the boxes arrive
- Pick the spot and prepare it. The base needs to be level and firm, in a shaded spot you can supervise from the house. See Preparing your yard for a cubby house: site, base and drainage.
- Check the rules. If there is any doubt about size, height or boundary distances, sort that out first. See Do you need council approval for a cubby house in Qld, NSW or Vic?.
- Plan the route. Large boxes can be long, heavy and awkward. Check that gates, side paths and steps are clear.
- Plan surfacing and extras. Mulch, sand, paint and sealant take time to organise. See Cubby house surfacing and fall safety: mulch, sand and soft-fall in Australia.
- Choose your weather. Pick a dry, mild day. In a hot part of Australia, start early so you are not assembling in the afternoon sun.
- Recruit helpers. Many kits need two adults, and tall or raised models may need more.
When the boxes arrive
- Check for damage before you sign. Note anything that looks damaged on the delivery paperwork, and take photos.
- Open the boxes and check the parts against the list. Do it in a dry area, then contact the seller promptly about anything missing or damaged.
- Keep the packaging until you are sure everything is right, in case a part needs to be returned.
- Read the instructions all the way through before you start. It helps to know what comes later.
Sort and label everything
Lay the panels, posts and rails on a drop sheet or tarp, and group the hardware. Many assembly problems come from mixing up similar-looking parts. A few ideas:
- Sort screws, bolts and washers into labelled containers or an egg carton.
- Label panels with masking tape and a marker, using the names from the instruction booklet.
- Keep the instructions in a clear plastic sleeve so they stay readable.
- Lay a drop sheet down, especially if you plan to paint or oil the timber before assembly.
Tools you will probably need
Check the instructions for the list, but common items include a cordless drill and driver, a socket set, a spirit level, a tape measure, a rubber mallet, work gloves and safety glasses. A step ladder helps for roofs. Charge the drill battery, or have a spare. If the kit includes a drill bit or key, use it rather than improvising.
Pre-finish the timber if you can
If you plan to paint or oil the cubby, it is often easier to do some of it before assembly, while the panels are flat. Coat all faces and edges, especially end grain and any cut edges, where water gets in. Let each coat dry as the product label says, and avoid painting in direct midday sun. Leave any surfaces that need to be glued or sealed as the instructions say. See How to paint and maintain a cubby house in the Australian climate.
Level and square
A cubby that is not level or square will fight you at every step, and may be less safe. Tips:
- Check the base with a spirit level in both directions before you start.
- Measure diagonals as you assemble the floor frame. If the two diagonals are equal, it is square.
- Assemble with the screws loose first, then tighten after checking square and level.
- Re-check as you add walls and the roof.
Fixings and finish
- Follow the order of assembly in the instructions. Skipping ahead often means undoing work.
- Do not overtighten screws into timber, which can split it.
- Use the fixings supplied, or galvanised or stainless equivalents for outdoor use. Kidsafe SA recommends galvanised nails and screws in play structures, finished flush or countersunk. See galvanised screws.
- Check for protruding bolt ends and sharp edges, and sand or cover as needed.
- Do not leave gaps where fingers, heads or limbs could be trapped.
Raised platforms, ladders and slides
If the cubby has a raised deck, take extra care with the platform, guardrails, ladder and slide. Kidsafe advises that elevated platforms have guardrails or barriers and that ladders and steps be securely attached. Two people should check each fixing. Never use the cubby before the guardrails and ladder are fully fixed. See Elevated cubby houses in Australia: platform height, safety and surfacing and Cubby houses with slides in Australia: what to check before you buy.
Roofing
Roofs are often the fiddly part. Work from a stable ladder, wear gloves, and do not do it on a windy or wet day. Check that roofing fixings are tight and that no sharp edges are exposed, and that there is no easy way for kids to climb onto the roof.
Anchoring
Kidsafe advises that larger play equipment be securely anchored to the ground. Follow the maker’s anchoring instructions for your product exactly. If the cubby sits on pavers or a slab, check that anchoring is suitable for that surface.
Finishing the site
- Add impact-absorbing surfacing before the kids use the cubby, if it has a raised floor.
- Rake and level the area, remove off-cuts, screws and packaging, and check carefully for dropped screws in grass.
- Add shade if needed.
- Keep a record of the instructions, receipts and warranty.
A safety walk-through before first use
- Check every fixing, rail, ladder and slide connection.
- Rock the cubby gently to check stability.
- Run a hand over all surfaces for splinters and sharp points.
- Look for gaps, entrapment points and anything that makes the roof or a fence easy to climb.
- Check the surfacing depth.
- Show the kids how to use the ladder and slide safely.
Re-check after a few weeks
Timber settles and screws can loosen. Check and tighten fixings after the first few weeks, and then monthly at first. See Cubby house safety standards in Australia: AS 4685, AS/NZS 8124.6 and Kidsafe for more on routine checks.
When to call a professional
Consider hiring someone if the cubby is large or raised, the base needs work, the ground is steep or you are short of time. Some retailers offer installation, and local handypeople often assemble flat-pack structures. Ask what is included, and whether it covers the base and surfacing.
Kit or DIY from scratch?
If you are still deciding between a kit and building from plans, see Cubby house kit vs DIY build in Australia: which suits you?. For help comparing the main options, see Best cubby houses in Australia: how to choose one that lasts.
Some links on this page are affiliate links. We may earn a commission if you buy, at no extra cost to you. See our Affiliate disclosure page.